|
|
NON OPERATED BLOCKS - SAFED KOH
|
|
Block:
Award Date:
Operator:
Working Interest Owner:
Province:
Prospective Zone:
Primary Objective:
Secondary Objective:
|
Safed Koh Block 3070-10
January 18, 2002
Dewan Petroleum
Dewan 60% Rally Energy 30% OGIL 10%
Punjab
II
Lower Goru , Chilton
Sembar, Ranikot & Dunghan
|
 |
| |
| |
- Safed Koh Block is located in Punjab. The block is in partnership with Dewan Petroleum & Rally Energy Safed Koh (RESK). OGIL has 10% working interest in Safed Koh, operated by Dewan Petroleum. This block comprises over three main structures Salsabil, Zindapir and Afiband having potential for commercial production of hydrocarbons.
- Proven gas tested in Lower Goru Sands & Chilton Limestone formations at the Salsabil field.
- Two Development wells drilled and confirmed the commercial reserves of hydrocarbons.
- 60 MMSCF/D Gas processing plant has been commissioned to process producing gas.
- Salsabil field also producing condensate at an average of 150bbls per day.
- LPG recovery plant is expected to commenced production by the end of year 2009.
- 1st gas sale to SNGPL started in June 2007.
- Deepening of an old well in Afiband structure is in progress to explore hydrocarbon in Lower Goru, Sembar and Chilton formations.
- Salsabil field is also producing gas from shallow horizons. Independent shallow well is drilled to produce these zones at its optimum potential.
- 150 km additional seismic survey has been planned in all three structures of Safed Koh block to conduct exploration and development drilling.
- 2009- 2010 Program: Exploration wells in Afiband structure.
|
|
|
|
|
|